FACTORY ASSUIT
IN
Investor Name:
Published Date:
January 1, 1970
Location:
Value:
Architecture:
About Project
FACTORY ASSUIT
The project relates to the construction of a new store area (about 4000 m2 extension and expansion of the main storage area.
SCOPE OF WORK
• Master planning
• Preliminary design
• Permit drawings
• Detailed design
• Steel design
• Architecture design
• Tender documents
• Construction supervision